Pilier 03 / 05Du capteur à la supervision

Auto- mation.

Une chaîne de contrôle-commande complète — du capteur à la supervision BMS/GTB — pour assurer la conformité BPF et la traçabilité 21 CFR Part 11. Régulation HVAC, gestion de la surpression, monitoring continu et data integrity.

Automatismes du bâtiment — GTC FC ENERGIE
BMS · Supervision · Remote management 24/7
A · Architecture pyramidale

Du capteur à la supervision.

Quatre niveaux hiérarchiques — du capteur (N0) à la supervision intégrée (N3) — pour assurer la conformité BPF et la traçabilité 21 CFR Part 11.

Niveau 3Supervision

BMS · GTB

Supervision centralisée, synoptiques, gestion énergétique, archivage data integrity.

Niveau 2Monitoring

Monitoring & traçabilité

Enregistrement continu T° / HR / ΔP / particules avec audit trail 21 CFR Part 11.

Niveau 1Régulation

Automates DDC

Automates programmables dédiés : CTA, surpression, interlock, redondance.

Niveau 0Terrain

Capteurs & actionneurs

Sondes, manomètres numériques, registres, variateurs, vannes motorisées.

Cascade de pression type
Atelier de production aseptique — valeurs cibles à respecter en continu
Zone Grade GMP Pression différentielle
Extérieur0 Pa
Couloir non classé+5 Pa
Sas habillage+15 Pa
Zone ISO 8Grade D+25 Pa
Zone ISO 7Grade C+35 Pa
Zone ISO 5Grade A / B+50 Pa
A · BMS features

Seven functions, one control point.

Complete centralization of the building's technical management — a single control point for equipment, energy and traceability.

A.01

Centralization

Plant or building equipment management brought together into a single control point.

A.02

Data archiving

Continuous recording of parameters and events — long-term retention for analysis and audit.

A.03

Energy savings

Consumption optimization — load shedding, night setback, free-cooling, drift monitoring.

A.04

Energy ratio

Tracking of the kWh ratio per workshop, line or product family — direct calculation of the unit energy cost.

A.05

Preventive maintenance

Automatic scheduling of preventive actions — based on operating hours and usage counters.

A.06

Start/stop scheduling

Time- and calendar-based programming of equipment start-ups, shutdowns and mode changes.

A.07

Custom synoptic interface

Real-time visualization of installations on a custom synoptic — 2D or 3D layouts, status color codes, hierarchical navigation between global and detailed views. Secure multi-user web access with fine-grained rights management.

A unified automation project?

Tell us about your project — preliminary study, audit or quote request. An engineer will get back to you within 48 hours with an initial technical assessment.