Case studies.
A selection of projects — pharma, hospital, aerospace, food & beverage, data center. Over 180 sites delivered since 2007.
Filter ·
2025 / CasablancaPharma
Sterile production unit
— pharmaceutical laboratory
2,400 m² of ISO 7/8 rooms, 4 dedicated AHUs, EU GMP Annex 1 qualification — 11-month lead time.
2024 / RabatHospital
Hybrid operating theater
8 operating theaters, ISO 5 filtration plenum, medical gases O₂/N₂O/Vacuum.
2024 / TangerData Center
Tier III server room
1.2 MW IT — chilled-water cooling, free-cooling, BMS.
2023 / CasablancaAerospace
Composites workshop
ISO 8 rooms, RH ±5% control, 1,800 m², EN 9100 project.
2023 / MarrakechLaboratory
Quality-control laboratory
ICH Q1A climatic chambers, ventilated benches, ultra-pure water.
2023 / CasablancaPharma
Primary packaging
Sterile filling line — laminar flow, GMP A/B, 21 CFR instrumentation.
2022 / KénitraFood & beverage
HACCP cutting room
Hygienic partitions, +2/+4 °C cold chain, perimeter drainage.
2022 / CasablancaHospital
Intensive-care unit
12 protective-isolation rooms, NF S 90-351, medical gases.